The work with the Sea Traffic Management concept and related projects have led to a large number of publications being released. Below you find the publications of the Efficientflow, STM Validation, STM BALT SAFE, MONALISA 2 and the MONALISA projects. Click on view or download to see a publication and use the publication type link (such as press release) or project name link to filter out similar publications.
BS_WP5.3 Prototype applications for ship reporting to MSW and SRS Deliverable, STM BALT SAFE |
View | Download | |
BS_WP5.4 Report describing the concept of use of the VDES satellite Deliverable, STM BALT SAFE |
View | Download | |
BS_WP2.1 Common schema_payload repository for STM BALT SAFE Deliverable, STM BALT SAFE |
View | Download | |
BS_WP2.2 Document with process and procedures for ensuring STM compatibility and interoperability Deliverable, STM BALT SAFE |
View | Download | |
BS_WP2.3 Documentation from Developers´ Zone meetings Deliverable, STM BALT SAFE |
View | Download | |
BS_WP6.3 Report on verification of STM Capabilities Deliverable, STM BALT SAFE |
View | Download | |
BS_WP6.2 – Analysis and Evaluation of the STM use case for tanker traffic Deliverable, STM BALT SAFE |
View | Download | |
BS_WP6.2.1 – Validation of WP3 Deliverable, STM BALT SAFE |
View | Download | |
BS_WP6.2.2 – Validation of WP4 Deliverable, STM BALT SAFE |
View | Download | |
BS_WP6.2.3 – Validation of WP5 Deliverable, STM BALT SAFE |
View | Download | |
BS_WP4.3 APP B STM_VTS_SOP_Adaptation_Training Deliverable, STM BALT SAFE |
|||
BS_WP4.3 Report of the Testbed for STM tools in VTS centres Deliverable, STM BALT SAFE |
View | Download | |
BS_WP3.4 (Onboard) Verification report and Proposals for standard operating procedures Deliverable, STM BALT SAFE |
View | Download | |
BS_WP3.3 (Onboard) Testbed report Deliverable, STM BALT SAFE |
View | Download | |
EfficientFlow – Results Ship Flow Optimization Deliverable, EfficientFlow |
View | Download | |
EfficentFlow – Results Port Flow Optimization Deliverable, EfficientFlow |
View | Download | |
BS_WP4.3 App A – STM VTS SOPs Deliverable, STM BALT SAFE |
View | Download | |
BS_WP4.2 Operational and technical use cases of STM compatible VTS tools Deliverable, STM BALT SAFE |
View | Download | |
BS_WP3.2 Procurement report and documentation Deliverable, STM BALT SAFE |
View | Download | |
BS_WP4.1 Operational concept of STM compatible VTS services Deliverable, STM BALT SAFE |
View | Download | |
BS_WP5.2 Automatic Ship Reporting -pre-study and concepts document Deliverable, STM BALT SAFE |
View | Download | |
BS_WP5.1 Use case, processes and data formats for automated ship reporting Deliverable, STM BALT SAFE |
View | Download | |
BS_WP6.1 Evaluation method specification for the STM use cases Deliverable, STM BALT SAFE |
View | Download | |
BS_WP6.0 Background for the Validation Deliverable, STM BALT SAFE |
View | Download | |
BS_WP3.1 Functional specifications for STMupgrade of navigational systems Deliverable, STM BALT SAFE |
View | Download | |
STMVal_D5.24 STM Operational aspects Deliverable, STM Validation Project |
View | Download | |
STMVal_D5.25 STM scenario, FSA analysis and CBA for STM reported Deliverable, STM Validation Project |
View | Download | |
STMVal_D2.8 STM Ship list Deliverable, STM Validation Project |
View | Download | |
STMVal_D2.6, D2.10 & D2.12 Voyage management testbed report.pdf Deliverable, STM Validation Project |
View | Download | |
STMVal_D5.26 Catalogue of New Competences related to the Stakeholders involved in STM in Shore, on board and for Operational Safety Deliverable, STM Validation Project |
View | Download | |
STMVal_D5.23 Legal and Liability Issues Assessed and Documented Deliverable, STM Validation Project |
View | Download | |
STMVal_D5.22 Report on Information Flows from Test Beds Deliverable, STM Validation Project |
View | Download | |
STMVal_D5.21 Version 2.0 of the Information Environment Created and Tested Deliverable, STM Validation Project |
View | Download | |
STMVal_D1.1 Enabling port optimization by a digital collaborative platform Deliverable, STM Validation Project |
View | Download | |
STMVal_D1.2 Demonstration plan for PortCDM test beds Deliverable, STM Validation Project |
View | Download | |
STMVal_D1.4 Role and routine of the PortCDM Council Deliverable, STM Validation Project |
View | Download | |
STMVal_D2.5 STM ship systems ready for installation Deliverable, STM Validation Project |
View | Download | |
STMVal_D2.7.1 Procurement 1.0 of STM ship systems Deliverable, STM Validation Project |
View | Download | |
STMVal_D2.7.2 Procurement 2.0 of STM ship systems Deliverable, STM Validation Project |
View | Download | |
STMVal_D2.9 & D2.11 STM Voyage Management testbed description Deliverable, STM Validation Project |
View | Download | |
STMVal_D2.13 e-certificates definition Deliverable, STM Validation Project |
View | Download | |
STMVal_D4.20 Evaluation Prototype SeaSWIM Deliverable, STM Validation Project |
View | Download | |
STMVal_D4.19 Procedures Principles SeaSWIM Deliverable, STM Validation Project |
View | Download | |
STMVal_D4.18 MC Enhancements for SeaSWIM Deliverable, STM Validation Project |
View | Download | |
STMVal_D4.17 Service Demand STM Services Deliverable, STM Validation Project |
View | Download | |
STMVal_D1.3 Improving port operations using Port Collaborative Decision Making Deliverable, STM Validation Project |
View | Download | |
STMVal_D6.27 Preparation of the communication and dissemination plan Deliverable, STM Validation Project |
View | Download | |
STMVal_D3.16 EMSN Summary Simulation Test Report Deliverable, STM Validation Project |
View | Download | |
STMVal_D3.15 EMSN Integration Test Report Deliverable, STM Validation Project |
View | Download | |
STMVal_D3.14 EMSN Management and Coordination Deliverable, STM Validation Project |
View | Download | |
STM D6 Communication and Dissemination Plan Deliverable, STM Validation Project |
View | Download | |
ML2 D1.1 Baseline Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D1.2 STM Concept of Operation and SOP Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D1.3 STM Architecture for EMSN Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D1.3.2 Voyage Exchange Format – RTZ Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D1.4 EMSN Infrastructural Specification Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D1.5 Shore-based Deep Sea Assistance Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D1.6.1 Tools and Services Tested in STM Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D1.7 Economic impact of MSP Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D1.7 MSP and Dynamic shipping route Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2 CBA – Cost-Benefit Analysis Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2 FSA – Formal Safety Assessment Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.0.1 Request for work Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.0.2 Statement of work Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.0.3 STM Architecture Framework Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.0.4 STM Architecture Description Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.1.1 Current Situation Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.2.1 STM Performance Target Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.3.1 STM The Target Concept Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.3.1-1 Target Institutional Description Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.3.1-3.1 Target Concept Business Description Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.3.1-3.2 Sea Voyage Costs Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.3.1-4.0 Sea Traffic Managment – A Holistic View Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.3.1-4.1 Strategic Voyage Management Description Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.3.1-4.2 Dynamic Voyage Management Description Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.3.1-4.3 Flow Managment Description Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.3.1-4.4 Port Collaborative Decision Making Description Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.3.1-5 Systems Technical and Technology Description Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.3.1-6 Information-Systems and Information-Technology Description Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.3.1-7 Human Aspects Description Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.3.1-8 Transversal Aspects Description Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.3.1-9 Performance Assessment Case Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.3.1-12.1 Understanding the Maritime Transport Ecosystem Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.3.1-12.2 Finding Information in the Maritime Transport Ecosystem Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.3.1-12.3 Collaboration in the Maritime Transport Ecosystem Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.3.1-13 Green Steaming Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.4.1 STM Strategic Roadmap Approach and Methology Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.5.1 STM Master Plan Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D2.7.1 PortCDM Validation Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3 Executive Summary Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.1.1 BBS Transfer and Adoption of Best Practices Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.1.2 BBS ICT Tool Adapted to Maritime Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.1.3 BBS User, Task and Environmental Profiles Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.1.4 BBS Deployment Road Map – ICT Aspects Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.1.5 BBS Customisation for Pilot Application Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.1.6 BBS Pilot – Usability and Issues Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.1.7 BBS Pilot – Proposed Improvements Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.1.8 BBS Roadmap MoS Deployment Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.2.1 ICT Tool SAR – System Requirements Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.2.2 ICT Tool SAR – External Interfaces Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.2.3 ICT Tool SAR – System Delivery Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.2.4 ICT Tool SAR – Test Plan Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.2.5 ICT Tool SAR – System Validation Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.3.1 Indoor Positioning Requirement Definition Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.3.2 Indoor Positioning PTS Design Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.3.3 Indoor Positioning PTS Pilot Development Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.3.4 Indoor Positioning PTS onboard Installation Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.3.5 Indoor Positioning PTS onboard Validation Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.4.1 SES Requirement Definition Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.4.2 SES System Design (Launching and Recovery) Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.4.3 SES System Simulation Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.4.4 SES Pilot Application Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.4.5 SES System Validation Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.5.1 Methodology Approach to CBA Analysis Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D3.5.2 CBA – Cost-Benefit Analysis of Safer Ship Sub-activities Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4 Final Report Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.1.1 Guidelines for Contingency Planning in Ports Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.1.2 Mass Evacuation in Ports Pilot Exercise Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.1.3 Conclusions from Mass Evacuation Exercise Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.2.1 Scenario Definition for SAR Exercise Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.2.2 Manoeuvring_Recovering of damaged ships Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.2.3 Simulations on Manoeuvring_Recovering of damaged ships Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.2.4 Requirement Specifications for OLRS Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.2.5 Platform Recovery for OLRS Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.2.6 Massive SAR Operation in Coastal Area Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.3.1 Extensive Risk Assessment in Ports Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.3.2 Collision and conflict candidates – causation factors Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.3.3&4 ICT tools supporting bridge operations Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.4.1 Report on Maritime Accidents Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.4.2 Application of Existing Reference Documents Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.4.3 Proposal of protocols in case of accidents Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.4.4 Procedures After Accidents Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.5.1 Efficient Management of Safety Information Systems in Ports Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.5.2 Information systems to Support SAR Operations Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.5.3 Implementation of Maritime-Hydrographical-Meteorological Info Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.5.4 Integrating Different Systems Technologies Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.6 Training Requirements Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.6.1 Training – Mass Rescue Operations Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.6.2 Training – Mass Evacuation in Ports Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.6.3 Training – Emergency Mgmt on Passenger Ships Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.6.4 Training – Leadership in Crisis Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.6.5 Training – SAR Deliverable, MONALISA 2.0 |
View | Download | |
ML2 D4.6.6 Training – LNG Firefighting Deliverable, MONALISA 2.0 |
View | Download | |
Cost Benefit Analysis of Route Exchange; MONALISA Final report 2014 Deliverable, MONALISA (1) |
View | Download | |
Impact on Affreightment; MONALISA Final report 2014 Deliverable, MONALISA (1) |
View | Download | |
Legal Impacts, Final Report: 02 April 2013 Deliverable, MONALISA (1) |
View | Download |